For prospective owners should be important to learn about the possibilities of the Structural Work. There are various possibilities. The simplest advice of an architect is to take advantage. However, this possibility is of course connected with costs. The second option is to gather information on various literature in the form of books and eBooks in advance. It should be distinguished, as the reading is based. It is best to choose a book that was written in practice.
Craftsmen can every single step that, for the creation of a house or a building shell is necessary to explain the easiest.
As an example of a book on shell creation, you can read sample using the following link Download a free ” My house conveniently built ”
This book was written from a bricklayer Master for non-specialists.
If you click the image below, you are the page-www.haus selbstgebaut.de redirected to.
Building your own house, but really!
Before we start on the ways you do best (not easiest) your own contribution skilfully integrated into your building, let me introduce myself.
My name is Tamas Banrevy and I am a bricklayer by trade master. Through years of self-employment, both domestically and abroad, I was able to experience in the building aside. In this blog I will try you to help with problems around their own homes.Ask questions calmly, no matter what kind, which revolve around this topic. I will as soon as possible reply to these questions.
Directly to the home building to get to the core, would be the first question:
First I would like to start with the possibility that a woman or man can build anything on their own performance. Here the answer is: almost everything. It is entirely up to you what you are in service around the capital construction trust. However, there are some basic rules that must be followed in every case to get bogged down in planning and execution of, or even by mistake a non-(or difficult) to correct errors in installing the building project.
This includes first of all the question: How do you imagine their way?
12. This, I admit, somewhat provocative question, I would say only that there are plenty of factors to be resolved before you can move into the private realm. (Ask for quiet, if something interests you)
These include:
1.What type of building project Imagine? (The all-important and most important question)
2. Planning of the existing money (plus 20% contingency reckon)
3. Financing (special repayment clause install?)
4. Costs of your home and real construction costs,
5. Ask the community regarding subsidies for alternative insulation materials,
6. Critical questioning of oneself: If you are a do-it-yourself “builder? This point is very important because some people here have sometimes been credited too much.
7. Schedule (you really need as much time as you to self-provision, without bringing himself and the craftsmen in the time delay?)
8. Mastery of basic technical knowledge (it is more practical for the professional conversation with the architects and artisans, besides, you know why and what happens on your site). For this topic I’ve written a book that you can find here.
9. Thoughts on individual performance (which I believe in myself and what I leave to the professionals?) This includes:Building trade (with the help of relatives, friends and neighbors),
10. Building Authority, Land Registry etc.
11. What construction materials and tools I need to successfully run my own performance? Pays it? What do I do after completing my work with the building material? It’s best to create a list or discuss with me in this blog.
12. Obtain information on building material prices (steel prices are prices sometimes days! At this point I would seek a binding offer for a building material dealers and can confirm this.)
13. Call costs on architects (see HOAI = fees for architects and engineers)
Selection of the facility (costs less and is sometimes more expensive than more expensive but closer! Here I am thinking of travel costs and wear on the cars)
14. Land purchase for your needs cut (note several factors. These include, among other things, the location of the property. For example, a steep slope and rocky terrain, the construction costs rising to unprecedented heights)
15. Selection of an architect (another chapter)
16.Cost of contractor costs to obtain (establish personal contact: somewhat like the Symathie between you and your dentist can show references)
17. Cost of construction machines, which are necessary for the production of own performance inquire.
Season into account (in the autumn or winter, I personally would not perform work that is sensitive to water such as:. Cover roof to film replaced or facade plastered Try nor with fan heaters in winter, hell-bent on a plastered surface in a very short time to get dry. This can lead to cracking!
Ask on unusual ideas about the construction project a local architect. This may be your question may already be answered in advance. You can also ask yourself the Planning Department (the first to determine whether your request by telephone is a cost. Make a connection request always confirm in writing!)
18. Transportation in the creation of own work (dignity pay off the purchase of a small van, pickup truck for the building phase?)
19.Neighborly cooperation (see before purchasing your future neighbors, try to get in touch Remember that.! In your house you want to stay for the next few decades)
20. You see this topic is very extensive. For this reason I want to execute the next time step by step, the points shown here with you.
If you are interested in digging in, you can visit this page or visit the following link
Concrete foundations, if you want to build a house yourself
If you want the formwork of the floor plate itself create, you should pay attention to some points. The first is the nature of the substrate is important. In a soft, sandy soil, the execution of the work is structured somewhat differently than in cohesive soil.
The advantage of a soft ground is that you are getting on with the work when you build your house yourself, much faster. However, this work has the foundation to build speed and your price. You must coordinate the time from the uprooting of the foundations are from the concrete. In summer, more precisely than in winter. This is because that sand is a non-cohesive soil. That means if he has been moved once, so the foundations were dug up, it tends to collapse do so because of the cohesion between the individual sand grains is small.
This property is much more to the fore in the summer than in winter when the soil is moist. In case of rain, it can also collapse because the individual grains of sand are washed away easily. Too close, you should not connect to the edge of the excavated foundations in sandy soil too, as they may also collapse.
In a sandy soil you have the mount for the formwork of the concrete slab of the basement floor about 40 cm deep into the ground to beat than the bottom of the foundation.In a 50 cm deep foundation, this means that the iron or wooden posts 90 cm from the upper edge facilities, shall be beaten into the ground.
If you have dug up the body of concrete foundations, you should immediately bring in a blinding layer, then insert the required reinforcing steel and the foundations with a maximum of one day’s delay (in summer the best in the evening the same day) concrete.
When cohesive and loamy soil processing is much more difficult, however, is the danger of collapse also much lower. Here you can leave the excavated foundations and even two or three days open without them collapsing.
For more information regarding the creation of foundations, please visit the website www.haus-selbstgebaut.de . Here you can get an eBook of Banrevy Tamas, a master mason, many helpful tips and information on how to build themselves a house.
A house building itself (the shell)
In the article “1.6 downloads, you can the first version (0.9) of the eBook for free download.What do you expect I will discuss in the following small list.
Contents
1. Plot
2. Mortgages
3. Architect
4. Planning
5. The “Red Spot”
6. Basement
1.6 Site Equipment
06/02 basement walls and staircases of prefabricated parts
3.6 Excavation
6.4 Reference Line
6.5 meters
6.5.1 Levelling instrument
6.5.2 height determination of the existing pavement
6.6 Steel order
7.6 Base plate
6.7.1 shuttering of the base plate
6.7.2 with a thin strip foundations or supporting floor plate
6.7.3 Floor construction
6.7.4 lifting system, position, height and formwork
6.7.5 Basic line to the pump shaft
6.7.6 Concreting of the pump shaft
6.7.7 Tips on laying the ground line
6.7.8 Kappilarbrechende layer
6.7.9 subbase
6.7.10 Static Plans
6.7.11 Installation of the iron bar
6.7.12 Installation of wire mesh
6.7.13 joint plate
6.7.14 concreting the floor slab
6.8 External walls, formwork and reinforcement
6.8.1 Conventional formwork elements
9.6 walls of the partitions
6:10 fireplace
6:11 ceiling above the basement
6:12 stairs Basics
6.12.1 staircase formwork
6.12.2 Installation of the reinforcement (steel) of the stairs
6.12.3 Installing the stage boards
6.12.4 Formwork a spiral staircase
6:13 insulation and outer groove
6:14 assembly of light boxes
7. Ground floor
1.7 stripping the hallway to the basement ceiling
7.2 Control of External dimensions
7.3 Creating the ground floor walls
7.3.1 Small stone size customer
This is only a partial list of the contents of this eBook. For more information please follow this link , or go to the page dierkt “1.6 Downloads”.